loading

End-to-end solutions from raw materials to production equipments for PU foam and mattress-Sabtech

How to Choose a Coriolis Mass Flow Meter for Polyurethane Dosing

Two Coriolis mass flow meters can have the same rated accuracy and still deliver different results on the same low-flow feed line. If one component is consistently underfed or overfed, the actual mix ratio will drift from the formulation target, which can affect product consistency.

How to Choose a Coriolis Mass Flow Meter for Polyurethane Dosing 1

Start with two operating points. How accurate is the meter at the lowest flow rate you actually use? At the highest flow rate, can the feed system handle the pressure drop across the meter? Once both conditions are met, compare the remaining specifications.

When Should You Use a Coriolis Mass Flow Meter?

If your formulation is specified by mass and you need to verify how much of each component is delivered during production, a Coriolis mass flow meter is one option. It measures mass flow directly and can be used to monitor live flow, record the total mass delivered, or provide feedback to the control system.

For monitoring, check whether the meter can measure and record the values you need. For automatic adjustment, confirm that the control system can use the flow signal to adjust a metering pump or control valve. If the existing metering system already holds the required ratio, start with the feed lines where online records or automatic adjustment would add value.

What Information Should You Confirm Before Requesting a Quote?

List the minimum, normal, and maximum mass flow rates for each feed line. The ranges for polyols, isocyanates, and other liquid components can differ considerably. If the equipment runs multiple formulations or production rates, include the operating points you actually expect to use. For batch dosing, also specify the target mass per batch and the dosing time.

Provide the fluid temperature at the meter, the corresponding viscosity, the operating pressure, and the allowable pressure drop. Polyol viscosity, for example, typically rises as the material cools. A meter that produces an acceptable pressure drop during normal operation may cause a larger pressure drop during a cold start. If the system must feed material at start-up temperatures, provide the temperature and viscosity for that condition as well.

Identify the material in each feed line and any planned cleaning agents. Note whether the material contains solid particles or corrosive additives so the supplier can check whether the wetted materials and meter design are suitable. Where hazardous-area requirements apply, verify the meter configuration against the classification of the installation location.

How Do You Compare Meter Models?

At minimum flow, check measurement error. At lower flow rates, the error associated with the meter’s zero stability can be larger as a percentage of the reading. Ask for the expected error at your minimum operating flow rate and check whether the low-flow cutoff could suppress a valid reading at that rate.

At normal flow, check error and repeatability. Ask for both values at your normal flow rate. If different formulations or production rates use substantially different flow settings, check the data at each of those operating points.

At maximum flow and under cold-start conditions, check pressure drop. Ask the supplier to calculate the pressure drop using the actual fluid, temperature, and flow rate for each relevant condition. Compare the results with what the feed system can accommodate. When comparing meter sizes and tube designs for viscous materials, use the calculated pressure drop as a selection criterion. If the line needs to be drained or cleaned, confirm that the meter will drain adequately in its installed orientation.

How Do You Verify Metering After Installation?

Check pipe support and alignment first. Once the fluid temperature has stabilized, follow the manufacturer’s instructions to verify the zero with the meter full and no flow through it.

Before testing, agree on the test medium, operating conditions, and allowable error. When isocyanates react with water, they can form insoluble polyurea and release carbon dioxide. The solids can obstruct the line. Confirm the test medium and acceptance procedure for isocyanate lines with the equipment and raw material suppliers.

  • Continuous dosing. Verify the actual flow rates and component ratios at normal operating points and at the lowest flow rate the process needs to maintain. If automatic adjustment is required at start-up or after a setpoint change, verify that flow rates and ratios stabilize within the specified time. If dosing is controlled during shutdown, verify it against the shutdown criteria.
  • Batch dosing. Verify the total mass delivered per batch. Where the test procedure allows, compare the meter total with a weighing reference of suitable accuracy. Run several batches to check both individual batch error and batch-to-batch variation. Include small batches if they are part of normal production.

Coriolis Mass Flow Meter Request for Quote Checklist

Information to provide

  • The material in each feed line, planned cleaning agents, operating fluid temperatures, and corresponding viscosities. Note any solid particles or corrosive additives.
  • Minimum, normal, and maximum mass flow rates, along with the allowable measurement error.
  • Operating pressure, allowable pressure drop, pipe connections, and installation conditions.
  • Continuous or batch dosing, and whether the meter will be used for monitoring or automatic adjustment. For batch dosing, include the target mass per batch and dosing time.

Information to request

  • Expected error and repeatability at the specified flow rates, zero stability, and available low-flow cutoff settings.
  • Estimated pressure drop under the relevant operating conditions, wetted materials, and rated operating temperature and pressure.
  • A calibration report or the proposed calibration points. Check whether the key operating flow rates are covered, especially the minimum.
  • A list of the instrument, installation accessories, and any application-specific components included in the quote.
  • Installation requirements, signal options, and the site acceptance procedure. Where hazardous-area requirements apply, request the applicable certification.

prev
Flexible PU Foam Formulation: How Much to Adjust and How to Evaluate Results
recommended for you
Get In Touch With Us

Just leave your email or phone number in the contact form so we can send you a free proposal!

sales@alforu.cn
+86-15687268672
6 (2)
Cynthia Cheung
Over 20 years of first-hand production and usage experience, our technology development team aims to make every machine exhibit the characteristics of simplicity, labor efficiency, ease of operation, and minimal maintenance.
Contact Us

Contact Person: Cynthia Cheung

Contact Number: +86-15687268672

Email: sales@alforu.cn

WhatsApp: +86-15687268672

Company Address: Foshan City, Guangdong Province China

Copyright © 2026 Sabtech Technology Limited | Privacy Policy Sitemap
Contact us
whatsapp
Contact customer service
Contact us
whatsapp
cancel
Customer service